Rapid KL and ETS
Downtown is Rapid KL and Touch 'n Go. The airport is KLIA Ekspres. Northbound is the ETS. There is no MTR and no Octopus. The ECRL still awaits safety approval. The RTS is not carrying passengers.
Airport express
The airport express runs to KL Sentral without stopping at every downtown station. Then change for KLCC, or sleep at the station.
0.5–2 h
LRT
KLCC, Masjid Jamek, Kampung Baru and Bangsar are on this line. It is the downtown spine, not the road to Genting.
0.5–2 h
Monorail
Bukit Bintang, Imbi, Hang Tuah and Chow Kit are on the monorail. It serves the Bukit Bintang day; it does not go to the airport.
0.5–2 h
MRT
The Putrajaya half-day uses the MRT or a bus to Putrajaya Sentral, then the administrative core. Not the same day as Batu Caves.
0.5–2 h
ETS
Kuala Lumpur, Ipoh and Butterworth are an ETS or a coach. Times follow KTMB that day. It is a travel day — do not hide it inside the sightseeing list.
0.5–2 h
Bus
Rapid Penang links George Town, Air Itam, Gurney and the botanic gardens — and they remain different days.
0.5–2 h
Checkpoint
Singapore crossings still use the checkpoint and the Causeway. RTS passenger service targets February 2027 and is not carrying passengers. Do not tell travellers they can already ride it.
0.5–2 h
East Coast Rail Link
Phase one has been publicly aimed at January 2027 and, at the time of writing, still awaits safety approval. It is not carrying passengers. Do not write it as open, and do not open east-coast place pages along it.
0.5–2 h